LLWDP II – PUBLIC NOTICE – Record of Decision on the Lesotho Lowlands Water Development Project Phase II for Zones 2 and 3 (Ha Lesiamo, Hlotse, Tsikoane and Maputsoe)

Business

Newsday
Newsday
Welcome to Newsday Media – Your Trusted Source for News and Insights in Lesotho! At Newsday Media, we are passionate about delivering accuratetimely, and engaging news and multimedia content to our diverse audience. Founded with the vision of revolutionizing the media landscape in Lesotho, we have grown into a leading hybrid media company that blends traditional journalism with innovative digital platforms. Our mission is simple: to inform, inspire, and empower our readers by providing comprehensive coverage of local and global events, current affairs, and cultural happenings. Whether you’re looking for breaking news, in-depth analysis, or captivating storytelling, Newsday Media is your go-to destination for all things news-related. With a dedicated team of journalists, editors, and multimedia experts, we are committed to upholding the highest standards of journalistic integrity and professionalism. We pride ourselves on delivering content that not only informs but also sparks conversation, fosters understanding, and drives positive change in our society. From our flagship newspaper to our dynamic digital platforms, we offer a wide range of multimedia content to cater to the diverse interests and preferences of our audience. Whether you prefer to stay informed through print, online articles, videos, or podcasts, Newsday Media has something for everyone. We believe in the power of storytelling to connect people, bridge divides, and inspire action. That’s why we’re dedicated to providing a platform for voices from all walks of life, championing diversity, inclusion, and authenticity in everything we do. Thank you for visiting Newsday Media. We invite you to explore our website, engage with our content, and join us on our journey to inform, inspire, and empower our community. Together, let’s shape the future of media in Lesotho.
Advertisement
GET YOUR TICKET NOW

PUBLIC NOTICE

Record of Decision on the Lesotho Lowlands Water Development Project Phase II for Zones 2 and 3 (Ha Lesiamo, Hlotse, Tsikoane and Maputsoe)

Notice is hereby given that the Ministry of Environment and Forestry through the Department of Environment issued an extension of the Record of Decision (RoD) on the 9th July 2025 authorizing continuation of on-going construction of the Lesotho Lowlands Water Development Project Phase II (LLWDP II) in Zones 2 and 3. The Project infrastructure authorised under the RoD comprise of the following work Packages:

  1. LLWDPII/W/05 – Construction of Distribution Network at Hlotse, Khanyane and Ha ‘Lesiamo

The work includes the construction of water distribution networks for Hlotse town, as well as Khanyane and Ha Lesiamo villages. The infrastructure includes approximately:

  • 390 km of water distribution pipelines ranging in size between DN63 to DN450 uPVC.
  • 1,500 house connections,
  • 7 concrete break pressure tanks including pressure reducing valve chambers, and 15 zonal isolation valve and flow meter stations.
  • Work also include removal of parts of the existing network and/or cutting off of parts of the existing network.
  • LLWDPII/W/06 – Construction of Distribution Network at Maputsoe, Tsikoane and Mpharane

The construction of distribution system and associated infrastructure associated infrastructure for Maputsoe, Mpharane & Tsikoane includes approximately:

  • 150 km of water distribution pipelines ranging in size between DN63 to DN630 uPVC.
  • 1,200 house connections,
  • concrete break pressure tanks including pressure reducing valve chambers, and 8 zonal isolation valve and flow meter stations.
  • Work also include removal of parts of the existing network and/or cutting off of parts of the existing network.

Qingjian Group (CNQC) has been engaged to implement both LLWDPII/W/05 and LLWDPII/W/06 work packages and commenced March 12, 2024.

  •  LLWDPII/W/04 – Construction of the Transmission Systems & Reservoirs

The construction of the transmission system and reservoirs includes:

  • 4 x Reservoirs – Total capacity of 14.95 Ml
  • 4 x Pipelines – ± 23.0 km x DN450 to DN850 Steel & ± 4.7 km x DN110 to DN200 uPVC
  • 1 x Pump Station – Q = 20 m3/h @ H = 75m, 1 Duty: 1 Standby
  • All associated valve chambers – isolation valves, air valves, scour valves, flow meters, control valves & pipe junctions
  • SCADA System

This work package is implemented by UNIK Botswana Construction Engineering (UNIK) and commenced May 7, 2024.

The infrastructure to be constructed includes the following:

  • Intake Works
  • Raw water Rising Main and Pump Station
  • WTW
  • Khanyane Rising Main (TR1)
  • Ha Lesiamo Rising Main (TR8)
  • Khanyane Command Reservoir (Z2R1)
  • Ha Lesiamo Reservoir (Z2R21)

This work package is implemented by China International Water & Electric. Corp (CWE) and commenced September 16, 2024.

  •  
  • Record of Decision

The Record of Decision is valid for two years from the date of issuance and authorises the Project. In terms of the Environment Act 10 of 2008, Section 25(5), any person, may request in writing, setting forth the reasons for their request that, the Director, Department of Environment reconsiders his decision within 30 days of this notification. Their request may be submitted directly to the Director, Department of Environment using the contact information below:

The Director

Department of Environment

Ministry of Environment and Forestry

Floor 7

Post Office Building

Kingsway Street

P.O. Box 10993

Maseru 100

Lesotho

Summary

  • Record of Decision on the Lesotho Lowlands Water Development Project Phase II for Zones 2 and 3 (Ha Lesiamo, Hlotse, Tsikoane and Maputsoe).
  • Notice is hereby given that the Ministry of Environment and Forestry through the Department of Environment issued an extension of the Record of Decision (RoD) on the 9th July 2025 authorizing continuation of on-going construction of the Lesotho Lowlands Water Development Project Phase II (LLWDP II) in Zones 2 and 3.
  • In terms of the Environment Act 10 of 2008, Section 25(5), any person, may request in writing, setting forth the reasons for their request that, the Director, Department of Environment reconsiders his decision within 30 days of this notification.